Unser Newsbereich ist online
Our news sec­tion is online
December 15. 2015
Perimeter Protection
Perime­ter Pro­tec­tion – the exhi­bi­tion for fenc­ing & secu­ri­ty systems
January 6. 2016

It’s as sim­ple as that! The three step setup.

Aufbau in 3 Schritten

The VIMTEC MBE 1500 can be set up in a few steps even by peo­ple with lim­it­ed tech­ni­cal skills in just a few min­utes. Once it has been placed in posi­tion, the four inter­nal hydraulic sup­port cylin­ders are extend­ed. They can be con­trolled sep­a­rate­ly, ensur­ing sta­bil­i­ty even on uneven ter­rain. Then the com­pres­sor for the pneu­mat­ic tele­scop­ic mast is switched on. Once the mast has been extend­ed to the desired height, the video man­age­ment sys­tem is acti­vat­ed. A phone call is made to the con­trol cen­tre to check that it’s pick­ing up the sig­nals from the MBE. Final­ly, the MBE is locked up and the inte­grat­ed secu­ri­ty sys­tems are activated.